(a) All work covered by this chapter shall be submitted for final inspection and approval before being placed in service.
(b) Tests necessary to verify that an installation is in conformity with the requirements of this chapter shall be performed in the presence of the Electrical Inspector and any equipment, material, power and labor necessary for such tests shall be furnished by the holder of the permit.
(c) When an inspection shows that work submitted for inspection is incomplete or not in conformity with the requirements of this chapter, the permit holder shall make the necessary corrections or additions and request a re-inspection.
(Ord. 97-38. Passed 2-3-97; Ord. 2004-116. Passed 8-2-04.)