12-1-7: MINIMUM STANDARDS FOR SEWAGE PLANTS:
Sewage and industrial waste treatment plants and facilities shall only discharge effluents to the City sewer system that meet the requirements of the Public Works Director as described in an industrial wastewater discharge permit. If the discharge is to a storm drain system, the requirements of the California Regional Water Quality Control Board must be met. (Ord. 1093, 1-20-1987)