1. Encroachment permit
g. Class 7 encroachment permit fee [§ 151.140]: $75.
h. Class 8 encroachment permit fee [§ 151.140]: $75.
3. License applications base fee for all encroachment licenses, except cable: $2,000.
4. Penalty assessment for failure to obtain encroachment or street cut permit: $1,000.
5. Pavement damage restoration fee: (reserved).
6. Within two years of construction of new streets, renovation or reconstruction of a street:
For each cut: (per square yard of cut): $30.
For cuts within the first two years, the fee is in addition to the requirement for street sealing in accordance with City Code § 151.009 (per sq. yd. of cut).
7. After construction of new streets, renovation or reconstruction of a street:
For Each Cut: (per square yard of cut): $30.
8. From three to five years after construction of new streets or renovation of a street: $25.50.
9. From five to ten years after construction of new streets or renovation of reconstruction of a street: $20.
10. Within one year prior to a city street renovation or reconstruction project approved in the capital improvement program of the city’s annual budget: No charge.
The minimum fee shall be based on one square yard. If a pavement cut is so extensive, or the cuts in one area are so numerous that the permittee prefers to perform a renovation (major rehabilitation) of the street in accordance with the Public Works Department requirements, or the full width of any impacted lane and the full length of any cuts plus pavement seal as required to reconstruct the street to the satisfaction of the Public Works Department.
11. If a pothole cut is done in advance of construction that will remove that portion of the pavement within a reasonable time as specified by the Public Works Department, no fee will be charged.
12. Plan review fees:
a. Fees for review of plans and specifications for parcels of ground to be fully developed with this submittal shall be as follows:
ACRES
|
FEE
|
ADDITIONAL FEE/ACRE
|
Up to 10 acres | $250 | + $75 per acre |
10-25 acres | $1,000 | + $65 per acre |
25-50 acres | $2,000 | +$40 per acre |
50 acres | $3,000 | + $30 per acre |
b. Fees for review of plans and specifications for parcels of ground which are to be subdivided into large sections for future development and for which the major infrastructure only is to be developed with this submittal shall be as follows:
ACRES | PLAN REVIEW FEE | ADDITIONAL FEE/ACRE |
Up to 10 acres | $62.50 | $18.75 |
10-25 acres | $250 | $16.25 |
25 to 50 acres | $500 | $10 |
50 acres | $750 | $7.50 |
c. Fees for review of plans and specifications for the individual developments within the parcels shall be charged in accordance with division 12.a. above, except the acreage used for fee computation shall not include perimeter rights-of-way which have been previously dedicated and approved.
d. Fees for review of the plan revisions which are initiated by the developer or required due to an error or oversight of the developer after plans have been approved by the Public Works Department, shall be charged the flat rate for each revision or set of revisions reviewed: $100.
13. Street clean up fee [§ 152.078] non-refundable: $100.
14. Application for disposition of roadway or easement [§ 152.232]
a. ROW vacation application fee (developed residential): $400.
b. ROW vacation application fee (non-residential): $500.
c. ROW appraisal fee (deposit of $200 required): actual cost.
15. Reimbursement agreement transaction fee [§ 152.142]: 5% of agreement amount.
1/2 FRONT FOOT
|
PER FOOT
|
a. Median construction | $10.50 LF |
b. Street lighting in median | $100 LF |
c. Landscaping in median | $1.75 SF |
d. Street lighting behind curb | $9 LF |
17. Inspection and testing fees [§ 152.077]
PAVEMENT
|
UNIT
|
FEE/UNIT ($/UNIT)
|
PAVEMENT
|
UNIT
|
FEE/UNIT ($/UNIT)
|
Paving public right of way/private streets & drives | SY | $0.26 |
Parking areas | SY | $0.07 |
Overlay (all) | SY | $0.09 |
Alley surface | SY | $0.26 |
Street sign bases | EA | $10 |
Street sign (city) | EA | $80 |
Mill & overlay | SY | $0.18 |
CONCRETE
|
UNIT | FEE/UNIT ($/UNIT) |
CONCRETE
|
UNIT | FEE/UNIT ($/UNIT) |
Driveway or alley entrance | EA | $19.57 |
Valley gutter | LF | $0.26 |
Apron | EA | $8 |
Curb and gutter | LF | $0.14 |
Sidewalk | SF | $0.05 |
Catch basin | EA | $22.25 |
Sidewalk ramp | EA | $17 |
WATER
|
UNIT
|
FEE/UNIT ($/UNIT)
|
Water pipe (4" or larger) | LF | $0.41 |
Water services | LF | $0.35 |
Pavement cut | SY | $17.40 |
Tapping sleeve and valve | EA | $60 |
Landscape irrigation system with backflow device | EA | $35 |
Fire line | LF | $0.41 |
SEWER
|
UNIT
|
FEE/UNIT ($/UNIT)
|
Sewer pipe (8" or larger) | LF | $0.42 |
Sewer service | LF | $0.31 |
Manhole | EA | $31.50 |
Pavement cut | SY | $17.40 |
Cleanout/drop connection | EA | $31 |
DRAINAGE
|
UNIT
|
FEE/UNIT ($/UNIT)
|
DRAINAGE
|
UNIT
|
FEE/UNIT ($/UNIT)
|
Retention basin (grading) | ACRE | $50 |
Irrigation pipe | LF | $0.78 |
Stormwater pipe (including box culverts) | LF | $0.84 |
Headwalls | EA | $31 |
Pavement cut | SY | $17.40 |
Drywells | EA | $56 |
Stormwater retention pipe | LF | $0.84 |
UTILITIES
|
UNIT
|
FEE/UNIT ($/UNIT)
|
Utility trenching in ROW/easement | LF | $0.16 |
Boring | EA | $15 |
Pavement cut | SY | $20 |
Service drops | EA | $15 |
Offsite after hours inspection | HR | $73 |
PERMITS
|
UNIT
|
FEE/UNIT ($/UNIT)
|
Permit application fee (non-refundable) | EA | $75 |