Every lot in a subdivision shall be capable of being served by utilities, and the necessary easements shall be provided. Electric, gas and other utility distribution lines shall be installed within public rights of way or within properly designated easements. To the fullest extent possible, underground utility lines located in street rights of way shall not be installed beneath existing or proposed paved areas and, in any case, shall not be installed prior to the placement of any paving. All electric and communication lines shall be installed underground in subdivisions initially containing ten or more lots, or in subdivisions in which expansion to ten or more lots is possible.
(Ord. 2143. Passed 8-16-93.)