(a) Where desirable or expedient, adequate easements or dedications for public service utilities shall be provided for sewer, water, electric power and gas lines and similar services. No structure, planting or obstruction of any kind shall be placed or allowed to be placed in or on any underground easement or access easement or to interfere in any way with any easement.
(b) Utility easements shall have a minimum width of twenty feet and be placed at the side or rear of lots whenever possible. When the Engineer determines that conditions are suitable for essential services, an easement reservation will be required.
(c) Aerial easements shall be a minimum of fifteen feet.
(Ord. 2143. Passed 8-16-93.)