8-3C-2: CONSTRUCTION REGULATIONS FOR SINGLE- AND MULTI-FAMILY R-1, R-2, R-3, R-4, A-1, A-2 AND A-3:
   A.   All detached structures requiring electrical service shall be served underground in an approved manner, and shall be suitably protected against physical damage.
   B.   All applications for permits to install or alter electrical wiring systems other than minor alteration or process wiring shall include plans indicating the following information:
Outlets to same circuit, number of outlets on each circuit, number of outlets proposed, number and size of wire to be drawn in conduit, and complete service and all feeder riser diagrams and grounding methods and material to be used.
   C.   All installations or alterations of electrical equipment shall be inspected before any of the work is concealed. Any person, firm, company, or corporation shall notify the Village giving twenty four (24) hours' notice before the required electrical inspection.
      1.   The Director of Engineering and Community Development is hereby empowered to remove or cause to be removed from said building any material which might interfere with a thorough inspection. Said removal shall be at owner's expense.
      2.   It shall be unlawful to use or turn on power into, or induce any electrical current to flow through any wire or equipment hereafter installed until approved by the Director of Engineering and Community Development. Commonwealth Edison Company shall not be permitted to install a service meter unless approved by the Director of Engineering and Community Development.
      3.   The foregoing does not restrict the issuance of the temporary approval by the Director of Engineering and Community Development for the use of electricity for construction purposes.
(Ord. 2245, 6-9-1992; amd. Ord. 3130, 6-19-2007)