7-2-5-1: WATER RATES AND CHARGES:
   A.   Connection Charges: All property for which a building permit may hereafter be issued, except municipal buildings owned by the village, which require a new connection with any mains or pipes, which are or hereafter may be constructed and used in connection with the village water system shall pay the following connection charges:
Meter Size
Connection Charge
Meter Size
Connection Charge
5/8 inch (residential)
$1,200.00
3/4 inch
1,500.00
1 inch
1,800.00
11/2 inch
4,150.00
2 inch
11,700.00
3 inch
18,275.00
4 inch
24,850.00
6 inch
31,000.00
 
   B.   Water Rates Established: All property upon which any building has been or may hereafter be erected within the corporate limits of the village, except municipal buildings owned by the village, having a connection with any mains or pipes which are or hereafter may be constructed and used in connection with the village water system, shall pay a basic user rate as follows, which rate shall become effective as follows:
 
Water Rate Per 1,000 Gallons
8-1-2012
$6.50
5-1-2013
7.50
1-1-2014
8.75
1-1-2015
9.75
 
   C.   Water For Construction Or Temporary Purposes: All nonmetered fire hydrant water used for new construction shall be billed at a flat rate of fifteen dollars ($15.00) per month. All other construction or temporary users performing work within the village can obtain water from the public works facility at twice the basic user rate per one thousand (1,000) gallons consumed.
Only contractors and public agencies performing work on public improvements, who cannot reasonably obtain water from other sources, will be allowed to use fire hydrants for water. A forty dollar ($40.00) connection charge per hydrant plus twice the basic user rate will apply.
(Ord. 1102, 10-26-1976, eff. 10-26-1976; amd. Ord. 2201, 11-26-1991; Ord. 3049, 7-19-2005, eff. 8-1-2005; Ord. 3326, 12-11-2012)