(A) The system development fees for the city shall be the following:
Meter Size | Water | Wastewater |
Meter Size | Water | Wastewater |
3/4" | $3,395 | $3,113 |
1" | $5,670 | $5,199 |
1.5" | $11,305 | $10,366 |
2" | $18,095 | $16,592 |
3" | $36,225 | $33,216 |
4" | $56,595 | $51,894 |
6" | $113,155 | $103,756 |
8" | $181,055 | $166,016 |
10" | $475,300 | $435,820 |
12" | $599,795 | $549,974 |
(B) The system development fee shall be solely based on meter size for water and wastewater.
(Ord. 2018-6-02, passed 6-11-2018)