§ 51.02 INSTALLATION OF SEPTIC TANKS.
   (A)   The installation requirements and prerequisites for the installation of septic tanks in all buildings now existing or hereafter constructed within the confines of the city, are as follows:
      (1)   A one-family dwelling shall have not less than one 500-gallon septic tank for sanitary purposes for the bathroom only; and not less than one 500-gallon drywell for refuse from the kitchen sink, stationary tubs, basement drains, and all other wastewater, with the exception of water from the roof.
      (2)   There shall be not less than 200 feet of field tile with 27 tons of crushed limestone which shall be equally distributed above and below the field tile.
      (3)   For a two-family dwelling, there shall be not less than a 750-gallon septic tank, and the provisions set forth in division (A) (1) and (2) above shall also be met.
      (4)   All installations of field tile shall not be installed closer than five feet from the adjoining property owner.
      (5)   All septic tank drawings shall be submitted and approved by the City Building Inspector.
      (6)   The Building Inspector shall inspect the installation before covering. It shall be the duty of the owner, builder, or plumber to so advise the Building Inspector and to obtain his approval before covering the installation.
   (B)   It shall be the duty of the Building Inspector to carry out all of the provisions of division (A) above.
(Ord. 52-54, passed 12-7-54) Penalty, see § 51.99