925.32 PLAN FOR RUNOFF CONTROL.
   From the results of Section 925.31, the developer can determine the type and magnitude of control practices the developer will need, in most cases being some type of structural control. These controls should be located on the site plan and runoff calculations checked.
(Ord. 864. Passed 5-4-09.)