(A) Where sewer and water systems are installed, the mains shall be of adequate size to accommodate future growth and utilization. Stubs shall be provided to each lot from the utility main to the lot line for future connection. Wherever practical, similar utilities shall be placed in the same general location on streets of the same direction.
(B) Every lot in a subdivision shall be capable of being served by utilities, and easements acceptable to the utility companies shall be provided. Electric, gas, and other utility distribution lines shall be installed within public rights-of-way or within properly designated easements. To the fullest extent possible, underground utilities lines located in street rights-of-way shall not be installed beneath existing or proposed paved areas and in any case shall be installed prior to the placement of any paving.
(Prior Code, § 536.070)