The subdivider shall connect to the public water supply and construct a system of water mains with a connection for each lot.
(A) Where public water is not available, as determined by the City Council, the subdivider shall supply acceptable evidence of the availability of water. The subdivider may be required to make one or more test wells in the area to be platted if such evidence is deemed not acceptable. Copies of well logs from said test wells which are obtained shall include the name and address of the well driller and shall be submitted with the plan to the Council.
(B) If a private water supply is permitted, individual private wells shall meet the requirements of the applicable county and the state, and shall be located at least 25 feet from property line.
(C) Where a connection to the city water system is presently available, water distribution facilities including pipe fittings, hydrants, valves, and the like, shall be installed to serve all properties within the subdivision. Water mains shall be a minimum of six inches in diameter and where larger mains are required to serve future growth, the city may elect to participate in the cost of such water mains. Looping of all water mains shall be promoted.
(Prior Code, § 536.050)