1315.09 OTHER PERMITS.
 
Processing fee (County)          $100.00
Structure moving
   Basic permit            $50.00 per structure
Structure demolition            $25.00
                  plus $ 2.00 per 100 sq. ft. per structure
Signs
   Up to twenty square feet      $25.00 each permit (does not
                      include electric)
   Each additional ten square feet   $7.50 each permit
Swimming Pools
   Above ground            $50.00 per inspection (does not
                      include electric)
   In-ground            $80.00
(Ord. 07-12. Passed 11-30-07.)