903.21 REFUND OF DEPOSIT.
   Upon notification by the permittee that all work authorized by the permit has been completed and after restoration of the opening, the Director shall refund to the permittee his deposit less all costs incurred by the City in connection with the permit. In no event shall the permit fee be refunded.
(Ord. 87-7. Passed 4-20-87.)