If the subdivider elects to construct streets totally out of Portland cement concrete or if such pavement is required by the City Manager, thicknesses of six inches for local and collector streets and seven inches for arterial, commercial, and industrial streets shall be required. The Planning Commission may require pavement of greater thickness, upon the recommendations of the City Manager based upon his evaluation of the subgrade, traffic, and wheel load conditions. Construction shall be in accordance with the Ohio Department of Transportation, Construction and Material Specifications, Chapter 450, "Rigid Pavement," (January 1, 1995 edition incorporated herein by reference).
(Ord. 12-02. Passed 7-8-02.)