1. The developer shall be responsible for providing record drawings of all SWM BMPs included in the approved SWM Site Plan. The record drawings and an explanation of any discrepancies with the construction plans shall be submitted to the Borough.
2. The record drawing submission shall include a certification of completion signed by a qualified professional verifying that all permanent SWM BMPs have been constructed according to the approved plans and specifications. The latitude and longitude coordinates for all permanent SWM BMPs must also be submitted, at the central location of the BMPs. If any licensed qualified professionals contributed to the construction plans, then a licensed qualified professional must sign the completion certificate.
3. The Borough may conduct inspections during construction as it deems appropriate. If inspections performed by the Borough reveal deficiencies from the submitted and approved SWM Site Plan, the Borough may request corrective actions. Any corrective action shall be at the cost of the stormwater facility owner.
4. After receipt of the completion certification by the Borough, the Borough may conduct a final inspection.
(Ord. 946, 11/8/2018, §407)