§ 4.47 ORDERING CONSTRUCTION.
   The Director shall determine at least once a year which new sidewalks should be constructed during the year and which existing sidewalks shall be rebuilt or repaired. It shall be the duty of the Director, on or before June 1 of each year, to give the owner of the premises adjacent to where a sidewalk is to be constructed, rebuilt or repaired by the owner, written notice to construct, rebuild or repair the same within 30 days after the service of said notice. Initial construction shall be the responsibility of the property owner of the property adjacent to where the sidewalk is to be placed. Repair or replacement shall be the responsibility of the property owner adjacent to where the sidewalk is located if the actions or inactions of the owner, occupant, agents or contractors hired by the owner or occupant damage the sidewalk. In all other instances, repair or replacement shall be the responsibility of the city.
(Ord. effective 11-16-2018)