11B-3-10: ADMINISTRATIVE AND BOARD LEVEL APPLICATIONS:
   A.   Administrative Level Design Review Applications: All design review applications shall be reviewed and shall be acted on by the Administrator, except for applications for development specifically listed in subsection B below.
   B.   Board Level Design Review Applications: Shall be scheduled as stipulated in this Chapter. Design review applications for the following types of development shall be reviewed, and shall be acted on by the Design Review Board:
      1.   One or more new Buildings subject to design review;
      2.   An addition to an existing Building, subject to design review, which is greater than twenty five percent (25%) of the existing Gross Floor Area;
      3.   New Building facades with material changes, subject to design review;
      4.   An addition to an existing Building subject to design review that is equal to or greater than twenty thousand (20,000) s.f.; and
      5.   Master Sign plans which include five (5) or more businesses.
   C.   Concurrent Sign And Building Applications: All Sign applications (including master Sign plans) made pursuant to this Chapter that accompanies new development subject to design review are required to be submitted for review contemporaneously with the Building design review application is made. This Section is not intended to apply to Sign applications made for the advertisement of businesses in existing Buildings where no changes are proposed to the Building at the time of the application.
   D.   Administrator Decision: The ultimate decision of whether an administrative level review or board level review will be required shall be determined by the Administrator. (Ord. 895, 4-25-2023)