9-5-3-3: ENGINEERING PLANS:
The developer shall retain a professional engineer(s) to obtain the following information:
   A.   Soils Report: For any proposed hillside development, a soils engineering report shall be submitted with the preliminary plat. This report shall include data regarding the nature, distribution and strength of existing soils, conclusions and recommendations for grading procedures, design criteria for corrective measures and opinions and recommendations covering the adequacy of sites to be developed.
   B.   Geology Report: For any proposed hillside development, a geology report shall be submitted with the preliminary plat. This report shall include an adequate description of site geology and an evaluation of the relationship between the proposed development and the underlying geology and recommendations for remedial remedies.
The investigation and subsequent report shall be completed by a professional geologist registered in the state of Idaho.
   C.   Hydrology Report: For any proposed hillside development, a hydrology report shall be submitted with the preliminary plat. This report shall include an adequate description of the hydrology, conclusions and recommendations regarding the effect of hydrologic conditions on the proposed development, and opinions and recommendations covering the adequacy of sites to be developed. (Ord. 566, 5-15-2007)