§ 113.022 PERMIT FOR CONSTRUCTION OF TANK BATTERIES, BOOSTER PUMPS, COMPRESSOR STATIONS, AND PIPELINES.
   (A)   An oil and gas permit shall be obtained from the city for the construction of tank batteries, booster pumps, compressor stations, any hydrocarbon processing facilities and pipelines within the city limits if they are located separately from a well and if they are used in the operation of more than one producing well. Each request for permit must be accompanied by a diagram or layout showing location, arrangement, and size. It shall also describe the construction method and materials of the tanks and the product or substance to be stored therein.
   (B)   No person shall construct, erect, lay, or otherwise install any tank battery, booster pump, or compressor station on a location other than a well site without first having applied for and received an oil and gas permit in accordance with these regulations. Each application shall be on a form prescribed by the City Manager or his or her designee and shall include, but not be limited to, the following:
      (1)   Diagram to scale showing each location with existing and proposed improvement;
      (2)   Arrangement for size of existing and improvement;
      (3)   Type of construction and materials of all improvements; and
      (4)   Operations and emergency manual (electronic PDF file).
(Prior Code, § 113.012) (Ord. 1583, passed 1-8-2008) Penalty, see § 113.999