Backfill and dredging, if to be performed in connection with major construction, must be specified in requests for all permits as to: need, location, quality, and disposition of spoil. Only clean backfill may be used.
(1995 Code, § 62-57) (Ord. 101-A, passed 8-3-1987) Penalty, see § 151.999