§ 53.36  ADJUSTMENT OF CHARGES; BASIS.
   The city shall have the right to adjust the industrial cost recovery charges to any industrial user that makes a significant change in the volume, strength, or delivery flow rate.  Industrial users will only be required to pay for those years of the cost recovery period that they use the system and only at an annual rate in proportion to the length of the entire recovery period.
(1995 Code, § 58-537)  (Ord. 60, passed 4-2-1979)