§ 53.30  INDUSTRIAL USERS SUBJECT TO INDUSTRIAL COST RECOVERY CHARGE; BASIS.
   Each industrial user that discharges to the system will be subject to an industrial cost recovery charge equal to each industrial user’s allocable share of the federal construction grant received after 3-1-1973, based on pollutant loading, volume, and delivery flow rate.
(1995 Code, § 58-531)  (Ord. 60, passed 4-2-1979)