10-2-1: BUILDING PERMITS AND FEES:
   A.   No building shall be erected or substantially altered unless a building permit has been issued by the Zoning Administrator stating the building complies with this title. For purposes of this subsection, the construction of a garage, deck, porch, patio, fence, or swimming pool shall be deemed an alteration of a building.
   B.   The Zoning Administrator shall prescribe a form for an application for a building permit. The form shall require, at a minimum, the name and address of the person seeking the building permit, the purpose of the construction, the present zoning classification of the property and a sketch map showing the dimensions of the lot, the location, square footage and setbacks of any existing structures on the lot and the square footage, location and setbacks of proposed structures, if any, to be constructed on the lot. The form provided by the Zoning Administrator shall contain the following legend, to be initialed as applicable in each case by the applicant:
THE APPLICANT CERTIFIES THAT THE STRUCTURE TO WHICH THIS APPLICATION APPLIES HAS BEEN DESIGNED AND SHALL BE BUILT IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE, 2012 EDITION, AND THE CURRENT EDITION OF THE ILLINOIS PLUMBING CODE. ALL SUBCONTRACTORS AND THE OWNER HAVE BEEN OR SHALL BE NOTIFIED OF THIS CERTIFICATION.
THE APPLICANT CERTIFIES THAT THE STRUCTURE TO WHICH THIS APPLICATION APPLIES HAS BEEN DESIGNED AND SHALL BE BUILT IN ACCORDANCE WITH THE INTERNATIONAL RESIDENTIAL CODE FOR ONE AND TWO FAMILY DWELLINGS, 2012 EDITION AND THE CURRENT EDITION OF THE ILLINOIS PLUMBING CODE. ALL SUBCONTRACTORS AND THE OWNER HAVE BEEN OR SHALL BE NOTIFIED OF THIS CERTIFICATION.
   C.   Each building permit application shall be accompanied by a fee, as follows:
      1.   Residential:
Estimated Cost Of Project
Fee
Estimated Cost Of Project
Fee
$0.00 to $500.99
$15.00 1
$501.00 to $1,999.99
20.001
$2,000.00 to $3,999.99
25.001
$4,000.00 to $9,999.99
30.001
$10,000.00 to $19,999.99
35.001
$20,000.00 to $44,999.99
40.001
$45,000.00 to $49,999.99
45.001
$50,000.00 and up
$1.00 per thousand with a $200.00 maximum1
 
   Note:
      1.    Plus tap fees.
Example: A building permit for a house with an estimated cost of one hundred fifty thousand dollars ($150,000.00) would require a one hundred fifty dollar ($150.00) permit fee plus tap fees.
A building permit for a house with an estimated cost of two hundred fifty thousand dollars ($250,000.00) would require a two hundred dollar ($200.00) permit fee plus tap fees.
      2.   Business, Commercial, And Industrial: The building permit applicant will pay a building permit fee that is equivalent to the schedule of fees below or seventy five percent (75%) of the construction plan review, whichever is greater. The applicant will initially pay the fee as indicated in the schedule for fees below. If seventy five percent (75%) of the cost of the construction plan review is greater than the initial permit fee, the applicant will be billed and will not get the building permit until it is paid. The fee for each permit or re-inspection shall be paid when the application is filed in the case of a permit fee, or upon receipt of a statement in the case of a re-inspection fee. The declaration of estimated construction cost shall be made by the permit applicant. If the department determines that the estimated construction cost is unreasonable, the department may request the permit applicant to show proof of the actual construction cost, and may adjust the fees to reflect the actual construction cost. The value to be used in computing the building permit fees shall be the total value of all construction work including materials and labor for which the permit is issued and shall also include all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems and any other permanent equipment.
Estimated Cost Of Project
Fee
Estimated Cost Of Project
Fee
$0.01 to $5,000.00
$100.00 minimum
$5,000.01 to $10,000.00
$200.00 + $2.00 per hundred or part thereof over $5,000.01
$10,000.01 to $50,000.00
$300.00 + $1.25 per hundred or part thereof over $10,000.01
$50,000.01 to $100,000.00
$800.00 + $0.80 per hundred or part thereof over $50,000.01
$100,000.01 to $1,000,000.00
$1,200.00 + $0.20 per hundred or part thereof over $100,000.01
$1,000,000.01 to $10,000,000.00
$3,000.00 + $0.15 per hundred or part thereof over $1,000,000.01
$10,000,000.01 to $100,000,000.00
$16,500.00 + $0.10 per hundred or part thereof over $10,000,000.01
Over $100,000,000.00
$125,000.00 + $0.05 per hundred or part thereof over $100,000,000.00
Inspection fee and re-inspection fee
$100.00 per hour
Inspection fee outside of normal business hours (minimum 1 hour)
150.00 per hour
 
All tap fees will be in addition to this fee schedule.
   D.   Upon receipt of a building permit application, the Zoning Administrator shall refer the application to the various Village utility departments and/or JULIE (joint utility locating information for excavating) to determine whether the proposed structure would interfere with any installed utility or any easement. No permit shall be issued if such interference is present unless consented to in writing by the affected public utility or where a Village owned utility is involved, by the Village.
   E.   Within ten (10) days of receipt of a building permit application accompanied by the appropriate fee, the Zoning Administrator shall issue the permit or deny the permit. In the event the permit is denied, the Zoning Administrator shall state the reasons therefore, in writing, and shall refer to the appropriate provisions of this title. The denial of the building permit shall state that the applicant has ten (10) days to appeal the denial to the Zoning Board of Appeals in accordance with the procedures set forth in this title.
   F.   The holder of a building permit shall initiate construction of the work described in the building permit within thirty (30) days of the date of issuance of the building permit and shall finish construction of the work within one year of issuance of the building permit. If the work is not initiated or completed within the time set forth in this subsection, the building permit shall lapse and the holder thereof shall be required to apply for a new building permit for the lot in question.
   G.   Building permits are nontransferable.
   H.   Building permits shall be prominently displayed at the site of construction in an area protected from the weather or in a transparent waterproof envelope or other suitable frame.
   I.   A record of all building permit applications and building permits shall be kept on file by the Zoning Administrator and shall be a public record.
   J.   No building permit application fee shall be required where:
      1.   A building permit application is denied and the application is amended and resubmitted within fourteen (14) calendar days; or
      2.   A building permit application is denied, the applicant seeks and obtains a variance which obviates the grounds for denial, and the building permit application is resubmitted within fourteen (14) calendar days of the grant of variance. (Ord. 2018-004, 6-27-2018)