§ 51.015  CONNECTION FEES.
   A $1,500 hook up fee plus the cost of all parts and labor to extend the waterline from the mainline to the property line, including the vault and meter, will be charged to the property owner. All work done to get the waterline to the vault at the property line will be completed by the city or its designee and charged to the property owner. The owner is responsible for any labor and material for extending the waterline from the vault to the desired location on his or her property.
(Res. 2010-03, passed 3-1-2010)