§ 153.115 RIGHT-OF-WAY IMPROVEMENTS.
   After all street and utility work has been completed, all public right-of-way not covered by pavement shall be covered with a minimum of 4 inches of topsoil and seeded or sodded to the satisfaction of the Village Engineer.
(Ord. 1996-01, passed 2-13-1996; Am. Ord. 2007-15, passed 7-10-2007; Am. Ord. 2021-03, passed 3-9-2021) Penalty, see § 153.999