(A) Building permits. Before issuance of any building permits for the improvement of lots within a subdivision or Planned Development, the subdivider, builder or developer shall:
(1) File with the Zoning Administrator, the approved, recorded final plat of subdivision.
(2) Completely and satisfactorily install functioning sanitary sewer systems, storm sewer and water service to each lot and street paving with the exception of the final pavement course.
(B) Occupancy permit. Before issuance of any certificate of occupancy, and in addition to any other requirements of the village for certificates of occupancy, the street lighting system shall be installed and functioning, street identification signs and traffic control signs shall be installed, all electrical, telephone and gas utility lines shall be installed, a hard-surface driveway shall be installed together with adequate private hard-surfaced parking areas to serve the structure(s) for which occupancy is sought, and the parkway shall be finish graded.
(Ord. 2007-15, passed 7-10-2007; Am. Ord. 2021-03, passed 3-9-2021) Penalty, see § 153.999