(A) Permit holders shall keep facilities authorized by a permit in a good state of repair.
(B) If the operating pressure for existing pressure pipe lines covered by a permit is raised above the “maximum operating pressure” shown in a permit, application for a new permit or an amendment to the existing permit is required.
(C) If additional conductors, or replacement conductors of a higher capacity, on an existing aerial pole line covered by a permit are installed, application for a new permit or an amendment to the existing permit is required.
(Ord. 88, passed 4-5-1982)