163.10 SWPPP REQUIREMENTS.
   Every SWPPP submitted to the City in support of an application for an LDP Permit:
      1.   Shall comply with all current minimum mandatory requirements for SWPPPs promulgated by the IDNR in connection with General Permit #2.
      2.   Shall, if the applicant is required by law to file a Joint Application Form, PROTECTING IOWA WATERS, IOWA DEPARTMENT OF NATURAL RESOURCES AND U.S. ARMY CORPS OF ENGINEERS, comply with all mandatory minimum requirements pertaining to such applications.
      3.   Shall include evidence of permit approval for all applicable state or federal permits in existence at the time of application.
      4.   Shall be prepared by a licensed professional engineer or landscape architect or a certified professional in erosion and sediment control (CPESC) or a representative of the local Soil and Water Conservation District, credentialed in a manner acceptable to the City.
      5.   Shall include within the SWPPP a signed and dated certification by the person preparing the SWPPP that the SWPPP complies with all requirements of this chapter.