1169.01 Purpose.
1169.02 Preapplication conference.
1169.03 General development plan.
1169.04 Submission to State Highway Director.
1169.05 Preliminary plat procedure.
1169.06 Preliminary plat application fees.
1169.07 Public hearing.
1169.08 Technical design and construction.
1169.09 Final plat procedure.
1169.10 Replats, subdivision vacations.
1169.11 Specifications of documents to be submitted.
1169.12 Preapplication conference documents.
1169.13 General development plan documents.
1169.14 Preliminary plat application documents.
1169.15 Technical design and construction plan documents.
1169.16 Final plat documents.