(a) The Construction Site Plan developed to meet these regulations will be coordinated and combined with the Riparian/Wetland Setback Plan and the Post-Construction Plan that are developed for the same site. These plans will be titled and numbered in one consecutive sequence to comprise the Comprehensive Storm Water Management Plan for the site.
(b) The Comprehensive Storm Water Management Plan so developed will serve as the Storm Water Pollution Prevention Plan (SWP3) required by the Ohio EPA as part of the NPDES Storm Water Permit for General Construction and as the Storm Water Run-Off Control required by the City. (Ord. 7675. Passed 11-11-14.)