(a) Electric service and communication services shall be provided within each subdivision.
(b) Gas service may be required where reasonably accessible. Whenever such facilities are reasonably accessible and available, they may be required to be installed within the area prior to the approval of the final plat.
(c) Telephone, electric, and street lighting wires, conduits and cables are encouraged to be constructed underground.
(d) Overhead utility lines, where installed, shall be located at the direction of the respective utility.
(e) Whenever a sanitary sewer line and electric or telephone line are each placed underground in the same utility easement, the following provisions shall be applicable:
(1) The total easement width shall be not less than 20 feet.
(2) The sanitary sewer line shall be installed within three feet of one side of the easement, and the electric or telephone line shall be installed within three feet of the opposite side of the easement.
(f) Utilities shall be installed in accordance with the agreement between the respective utilities. (Ord. 7675. Passed 11-11-14.)