921.12 CONSTRUCTION CLEANUP REQUIREMENTS.
   Final cleanup shall include complete repair to damage and restoration to original condition of shoulders, surrounding pavement, curb and gutter, striping, traffic control devices including detector loops; cleaning of ditches, culverts and catch basins, and removal of loose material from back slopes of ditches. This clean up shall not exceed 500 lineal feet behind excavating operations. Street surfaces shall be kept clean at all times with the use of a power broom or other approved methods. (Ord. 09-19. Passed 9-14-09.)