§ 4.19.040 FEE PAID BEFORE WATER IS TURNED ON.
   The wastewater (sewerage) development fee shall be paid before obtaining a building permit or must be paid before the water to the building is turned on.
(Prior Code, § 4.19.040) (Ord. 93, passed 3-19-2001; Ord. 2021-10, passed 12-20-2021)