§ 150.347 IMPROVEMENT LOCATION PERMIT; INDUSTRIAL USE; CERTIFICATE OF COMPLIANCE.
   An application for an improvement location permit for any industrial use subject to the provisions of §§ 150.170 through 150.178 of this chapter shall be accompanied by a certificate of compliance subscribed by a registered professional engineer or architect, certifying that the use intended will satisfy the standards of the enclosed industrial use or open industrial use, as the case may be, and in the district in which it is to be located. The Building Inspector may take ten days in which to study the application, during which time he or she may consult with appropriate technical consultants. If, after the ten-day period, the Building Inspector has not required any additional information or stated any objections in writing, the Building Inspector shall issue the improvement location permit.
(Prior Code, § 150.242) (Ord. 1978-4, passed 3-21-1978)