§ 53.102 BYPASS OF METER REQUIRED.
   (A)   Bypass around any new or existing meter installation will be required under any of the following circumstances:
      (1)   The service line on the outlet side of the meter is one and one-half inches or larger;
      (2)   The service line, regardless of size, serves refrigeration equipment; and
      (3)   The water service must not, for any reason, be interrupted while the meter is being repaired or replaced.
   (B)   The bypass shall be furnished and installed by the customer according to the utility’s specifications. Where existing piping not containing a bypass is altered to meet any of the above conditions, the alteration shall also include the installation of a bypass.
(Prior Code, § 51.72) (Amended 9-30-2008)