(A) Taps will not be installed until platting has been approved, rough grading has been completed, and sidewalks and curbs have been located.
(B) If pavement is to be placed where a main or taps are to be installed, then the developer shall be responsible for such installation at the developer’s cost.
(Prior Code, § 51.27) (Amended 9-23-2008)