§ 155.147 INDUSTRIAL DISTRICTS.
   (A)   General Industrial (G-I).
      (1)   The General Industrial District is established for manufacturing, distribution, warehousing, processing and related uses whose operating characteristics limit their effects on adjacent uses.
      (2)   Dimensional requirements.
         (1)   Lot size. One acre shall be the minimum lot area. Any part of the property located in the road right-of-way shall not be included in this minimum lot area.
         (2)   Lot width. Two hundred feet shall be the minimum width of each lot. The measurement shall be made from one side property line to the other at the building setback line.
         (3)   Front yard setback. Fifty feet shall be the minimum setback of the principal building, measured from the nearest point of the building to the right-of-way line.
         (4)   Side yard setback. Fifteen feet shall be the minimum side yard for each principal building.
         (5)   Rear yard setback. Thirty feet shall be the minimum rear yard for each principal building, measured from the nearest point of the building and the rear lot line.
         (6)   Off-street loading and unloading. Buildings constructed or converted to uses permitted in this district shall provide off-street loading and unloading space as required in §§ 155.070 through 155.072 of this chapter.
         (7)   Off-street parking. Requirements specified in §§ 155.050 through 155.053 of this chapter.
         (8)   Buffer strip. Upon any side or rear lot which abuts a residential district, there shall be a densely planted and maintained buffer strip. No such buffer shall, however, extend nearer to a street right- of-way line than the established building line of the adjoining residential lots, and no buffer shall be required upon any yard which abuts a public street.
   (B)   Heavy Industrial (H-I).
      (1)   The Heavy Industrial District is established for industrial, processing and related operations.
      (2)   Dimensional requirements.
         (1)   Lot size. Five acres shall be the minimum lot area. Any part of the property located in the road right-of-way shall not be included in this minimum lot area.
         (2)   Lot width. No specified minimum.
         (3)   Front yard setback. Fifty feet shall be the minimum setback of the principal building, measured from the nearest point of the building and the right-of-way line.
         (4)   Side yard setback. Twenty-five feet shall the minimum side yard for each principal building, measured from the nearest point of the building to the side lot line.
         (5)   Rear yard setback. Forty feet shall be the minimum rear yard for each principal building, measured from the point of the building nearest the rear line and the rear lot line.
         (6)   Off-street loading and unloading. Provided as specified in §§ 155.070 through 155.072 of this chapter.
         (7)   Off-street parking. Provided as specified in §§ 155.050 through 155.053 of this chapter.
         (8)   Buffer strip. Upon any side or rear lot which abuts a residential district, there shall be a densely planted and maintained buffer strip. No such buffer shall, however, extend nearer to a street right-of-way line than the established building line of the adjoining residential lot, and no buffer shall be required upon any yard which abuts a public street.
(1996 Code, § 155.147) (Ord. passed 5-21-1984; Ord. passed 5-3-2021)