6B-4-5: UTILITY SERVICES:
Approval shall be obtained from the City for the installation of communication, electric power, gas and other utility services before any installation is started. (Ord. 0-09-74-A, 12-2-1974)
6B-4-6: "AS-BUILT" DRAWINGS:
Upon completion of the various public improvements, the owner's engineer shall prepare for the City "as-built" drawings of all public improvements corrected to show actual dimensions and location of all construction, and supply the City Engineer with the corrected original tracings which shall become the property of the City, and one copy shall be supplied to the Public Works Supervisor. Final acceptance and release of bond or equivalent is contingent on this information. (Ord. 0-21-71, 11-15-1971)