§ 50.036  ADDITIONAL PRETREATMENT MEASURES.
   (A)   Whenever deemed necessary, the Town Manager may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage waste streams from industrial waste streams and other conditions as may be necessary to protect the POTW and determine the user’s compliance with the requirements of this chapter.
   (B)   The Town Manager may require any person discharging into the POTW to install and maintain, on his or her property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow.  A wastewater discharge permit may be issued solely for flow equalization.
   (C)   Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter.
   (D)   Users which operate vehicular wash facilities shall provide, operate and maintain pretreatment facilities approved by the Town Manager to control solids and preclude the discharge of toxics to the POTW.
   (E)   Users which operate food preparation facilities shall provide, operate and maintain pretreatment facilities approved by the Town Manager to control the discharge of greases, fats, oils and food solids to the POTW.
(Ord. 14-2000, passed 8-7-00; Am. Ord. 2-2013, passed 3-4-13)