SCHEDULE OF WASTEWATER RATES AND CHARGES
| |||
Phase I 7/1/2020 | Phase 2 4/1/2021 | Phase 3 7/1/2022 |
SCHEDULE OF WASTEWATER RATES AND CHARGES
| |||
Phase I 7/1/2020 | Phase 2 4/1/2021 | Phase 3 7/1/2022 | |
Metered Flow Rates: | |||
Metered flow rate (per 1,000 gallons) | $ 5.06 | $ 5.57 | $ 6.13 |
Monthly Base Charges (by meter size): | |||
5/8 - 3/4 inch meter | 22.75 | 25.03 | 27.53 |
1-inch meter | 49.73 | 54.70 | 60.17 |
1 ½-inch meter | 109.26 | 120.19 | 132.21 |
2-inch meter | 184.65 | 203.12 | 223.43 |
3-inch meter | 418.46 | 460.31 | 506.34 |
4-inch meter | 724.24 | 796.66 | 876.33 |
6-inch meter | 1,641.53 | 1,805.68 | 1,986.25 |
8-inch meter | 2,918.43 | 3,210.27 | 3,531.30 |
Unmetered Users: | |||
Non-metered users (monthly charge) | 50.55 | 55.61 | 61.17 |
Excessive Strength Charges (per pound) | |||
BOD surcharge in excess of 250 mg/L | 0.34 | 0.34 | 0.34 |
Suspended solids surcharge (in excess of 250 mg/L) | 0.34 | 0.34 | 0.34 |
Ammonia surcharge (in excess of 45 mg/L) | 0.68 | 0.68 | 0.68 |
Phosphorous surcharge (in excess of 10 mg/L) | 1.30 | 1.30 | 1.30 |
(Ord. 16-1986, passed 11-3-86; Am. Ord. 18-2012, passed 7-16-12; Am. Ord. 10-2020, passed 6-17-20)