§ 52.03 MAKING CONNECTIONS.
   (A)   All connections with the town’s electrical distribution system shall be made at a point to be designated by the Superintendent of the Electrical Department and under his or her supervision.
   (B)   Installation of all new or replacement secondary feeder lines shall meet the following specifications:
      (1)   At least ten feet above ground level at the point of attachment, whether SEC cable is used or conduit. If SEC cable is used, the point attachment shall be installed by the electrical contractor and the point of attachment shall be installed below the weatherhead;
      (2)   The point of attachment shall be of solid strength (eyebolt and the like); and
      (3)   The use of house knobs or any similarities shall be prohibited.
   (C)   Any deviation from the above specifications shall be approved by the Superintendent of the Electrical Department.
(Prior Code, § G-I-3) (Ord. passed 6-10-1975)