(A) Name, address and location, if different from the address);
(B) SIC number according to the Standard Industrial Classification Manual, Bureau of Budget, 1972, as amended;
(C) Wastewater constituents and characteristics including, but not limited to, those mentioned in §§ 54.043 and 54.046 as determined by a qualified laboratory; sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to § 304(g) of the Act, being 33 U.S.C. § 1314(g) and contained in 40 C.F.R. part 136, as amended;
(D) Time and duration of discharge;
(E) Average daily and three minutes peak wastewater flow rates, including daily, monthly and seasonal variations, if any;
(F) Site plans, floor plans, mechanical and plumbing plans and details to show all building drains, building sewers and appurtenances by the size, location and elevations;
(G) Description of activities, facilities and plant processes on the premises including all materials which are or could be discharged;
(H) Where known, the nature and concentration of any pollutants in the discharge which are limited by any local government, state or federal pretreatment standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis and if not, whether additional O&M and/or additional pretreatment is required for the user to meet applicable pretreatment standards;
(I) If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide the additional pretreatment.
(1) The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard.
(2) The following conditions shall apply to this schedule.
(a) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction and the like).
(b) No increment referred to in division (I)(2)(a) above shall exceed nine months.
(c) Not later than 14 days following each date in the schedule and the final date for compliance the user shall submit a progress report to the Superintendent including, as a minimum, whether or not it complied with the increment of progress to be met on that date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between the progress reports to the Superintendent.
(J) Each product produced by type, amount, process or processes and rate of production;
(K) Type and amount of raw materials processed (average and minimum per day);
(L) Number of type of employees, and hours of operations of plant and proposed or actual hours of operation of pretreatment system; and
(M) Any other information as may be deemed by the local government to be necessary to evaluate the application.
(1) The Superintendent will evaluate the data furnished by the user and may require additional information.
(2) After evaluation and acceptance of the date provided, the town will grant permission to discharge subject to the terms and conditions provided herein.
(3) Significant industrial users which through changes in the use of the premises or water usage cause a significant change in wastewater volume, strength or characteristic shall require a new application filed prior to making the change or alteration.
(Prior Code, § F-III-2)