Skip to code content (skip section selection)
Compare to:
SEC. 51A-12.309.   REPAIRS AND MAINTENANCE.
   (a)   All repairs and maintenance of pipelines must be performed in accordance with the United States Department of Transportation and Texas Railroad Commission mechanical integrity requirements.
   (b)   A pipeline operator shall protect, maintain in a state of good repair and condition, and regularly paint all pipeline risers and appurtenances related to pipeline construction and operations that are composed of materials generally protected or painted.
   (c)   If non-emergency repairs require excavation of a regulated pipeline, the pipeline operator shall provide written notice to the residents, property owners, and tenants within 500 feet, measured from the centerline of the pipeline to be excavated, at least five days before beginning the repairs.
   (d)   If above-ground non-emergency repairs that are not routine maintenance are required, the pipeline operator shall provide written notice to the residents, property owners, and tenants within 500 feet, measured from the centerline of the pipeline section to be repaired, at least five days before beginning the repairs. The written notice must be:
      (1)   sent by United States mail, postage prepaid, at least five days before beginning any non-emergency repair; or
      (2)   hand-delivery at least three days before beginning the non-emergency repairs. (Ord. 29228)