(a) The Village Engineer is hereby directed to, prior to the final approval of any newly installed sewer system and/or reconstructed sewer, require that any and all contractors cause to be made photographs of the entire sewer system installed, showing thereby that the sewer system has been constructed upon a sound engineering basis, that the sewer system is free of any and all accumulations of a foreign substance and nature and that the passage and flow of sewage and storm water are free and clear.
(b) Upon the inspection of such photographs and if satisfied that such sewer is free and clear of all foreign substance and that there is nothing present to prevent the free flow of sewage and storm waters, the Village Engineer is authorized to approve same as a final inspection, placing in safekeeping all photographs for future reference by the Village.
(c) The cost of such photograph and photographs shall be entirely paid for by the contractor or developer of such land and/or sewer system and such photographs shall remain the property of the Village.
(Ord. 1964-19. Passed 2-26-64.)