19.148.070   Minimum Artwork Value.
   The minimum expenditure for the artwork, including but not limited to design, fabrication, and installation, shall be one percent of the construction valuation, with the following tiers:
   A   1% of the first $100 million of construction valuation.
   B.   0.9% of construction valuation for valuation in excess of $100 million.
(Ord. 2175, § 1 (part), 2018; Ord. 2085, § 2 (part), 2011; Ord. 2037 (part), 2009)