The minimum expenditure for the artwork, including but not limited to design, fabrication, and installation, shall be one percent of the construction valuation, with the following tiers:
A 1% of the first $100 million of construction valuation.
B. 0.9% of construction valuation for valuation in excess of $100 million.
(Ord. 2175, § 1 (part), 2018; Ord. 2085, § 2 (part), 2011; Ord. 2037 (part), 2009)