(A) Methods to be followed. After approval of the preliminary plan, the subdivider shall install the required improvement under the supervision of the appropriate authority.
(B) Minimum improvements. The subdivider may elect to carry out minimum improvements by any the following methods:
(1) By installing the required improvements, and obtaining from the borough a certificate stating that all improvements have been installed in accordance with the standards and specifications contained in this subchapter; and
(2) By posting with the borough a certified check or bond running to the Borough Council of the borough an amount sufficient to cover the full cost of installing the required improvements as estimated by the appropriate authority. In case of a bond filed, it shall also:
(1) Be with surety satisfactory to the borough; and
(2) Specify the time for the completion of the improvements and installations, such time to be satisfactory with the borough.
(Prior Code, Ch. 22, § 610) (Ord. 173, passed 10-5-1970, § 610)