(A) Provision of sewer system. Sanitary sewers shall be installed to adequately serve all lots with connections to the public system.
(B) Capped sewers. Where the borough has a plan for extending the public sanitary sewer system into an area that is being subdivided, and it is reasonably expected that the area will be served by the public system within a period of five years, capped sewers shall be installed to adequately serve all lots in the proposed subdivision as well as provisions set forth in division (A) above.
(C) Location of sewer lines. Whenever sanitary sewers are provided they shall be located as near to the centerline of any street right-of-way as is reasonably possible and all such sewer lines shall provide service connections to the property line of each and every lot, said service connections being properly capped.
(D) Type of sewer system. No combined sanitary and storm sewer systems will be permitted.
(E) Manholes. Sanitary and storm sewer manholes will be provided at all changes in grade and direction and in no instance shall the distance between said manholes exceed 400 feet.
(Prior Code, Ch. 22, § 607) (Ord. 173, passed 10-5-1970, § 607)