1199.02 STREET SECTION.
   (a)    General. All street section construction and materials shall be in accordance with the minimum requirements shown on the typical street section for the appropriate type street in the appendix. Construction and material standards shall be in accordance with the Ohio Department of Transportation Construction and Material Specifications, current edition, except as modified herein and shall also be in accordance with applicable City standards. Street sections exceeding these minimum requirements or utilizing alternative construction or materials equal to or better than these minimum requirements may be approved.
   (b)    Topsoil Removal. All topsoil may be removed from the area of the pavement, sidewalk and curb ramps. Such topsoil shall be stockpiled and reused in unpaved areas.
   (c)    Subgrade Testing. All pavement subgrade shall be proof rolled where required and as directed by the Service Director. The Service Director may also require compaction testing in fill areas. The costs of all such proof rolling and testing shall be the responsibility of the subdivider.
(Ord. 0-37-95. Passed 5-15-95.)