1189.04 FEES.
   (a)    Filing Fee. Each subdivider shall pay a filing fee, at the time of preliminary plat submittal, in the amount of $150.00 for commercial and industrial subdivisions and in accordance with the following schedule for residential subdivisions:
 
Number of Lots      Filing Fee
10 or less          $50.00
11-50             $100.00
51-100          $200.00
over 100          $300.00
   The filing fee shall be paid in cash or by certified check or money order made payable to the City and shall be deposited with the City Finance Director for transfer to the general fund.
   (b)    Construction Inspection Fee. Each subdivider shall deposit (cash, certified check, money order or letter of credit) with the City Finance Director, at the time of execution of the Subdivider's Agreement, $1,000.00 to cover the cost of construction inspection (by the City or its designated representative). The subdivider will then be billed monthly by the City for the cost of construction inspection.
      (1)   If the actual cost of the construction inspection is less than the amount deposited, the subdivider shall be refunded the difference between the actual cost and the amount deposited. If the actual cost of the construction inspection is greater than the amount deposited, the subdivider shall be billed the difference between the actual cost and the amount deposited. Such bills shall be paid in legal tender or by certified check or money order made payable to the City and within 30 days of billing and such funds shall be utilized to cover the additional cost of construction inspection.
      (2)    The purpose of the construction inspection is to determine whether the constructed improvements are in accordance with these Subdivision Regulations. Total inspection fees for any development shall be limited to a maximum of $100.00 per lot.
         (Ord. 0-37-95. Passed 5-15-95.)